Schontek Inc. Independent electronic component distributor

Insights / Sourcing

PCB Costs Push 65-in LCD TV Panel Production Costs Up 6.5%

TL;DR

Production costs for 65-inch 4K TFT LCD panels are forecast to increase 6.5% year-on-year (YoY) in the fourth quarter of 2026, driven primarily by higher printed circuit board (PCB) prices, according to Omdia. Investment in AI servers is tightening PCB supply, pushing up prices of materials used in panel manufacturing. Display producers are also facing inflationary pressures from higher refined oil prices amid Middle East tensions and rising semi

PCB Costs Push 65-in LCD TV Panel Production Costs Up 6.5%

Production costs for 65-inch 4K TFT LCD panels are forecast to increase 6.5% year-on-year (YoY) in the fourth quarter of 2026, driven primarily by higher printed circuit board (PCB) prices, according to Omdia. Investment in AI servers is tightening PCB supply, pushing up prices of materials used in panel manufacturing. Display producers are also facing inflationary pressures from higher refined oil prices amid Middle East tensions and rising semiconductor costs. Display glass, the most expensive material in panel production, has risen approximately 45% in yen terms between 2023 and 2026.

Schontek observation

The practical question for a buyer sourcing AI hardware parts is what this changes about ordering today.
No specific orderable part number is named, so we would treat this as direction signal only and confirm the affected parts from the manufacturer announcement before quoting anything.
The checkable figures in this report (6.5%, 45%, 20%, 10%) are the ones worth re-verifying against the datasheet, since pricing and lead time conversations turn on them.
Schontek holds independent stock and cross-references parts that go on allocation; send us a part number and we will confirm availability and delivery from our own position, not from this article.


Source: EETimes-Asia

Market context is useful. A specific answer is better. Availability and delivery terms are confirmed per RFQ.

Need the signal for one MPN?

Bring us the
part number.

Send the MPN, quantity and target date for a sourcing review.

Request a quote Check the stock index sales@schontek.com