Schontek Inc. Independent electronic component distributor

Insights / Shortage

Peak Nano Scales NanoPlex HDC Capacitor Film Production 20-Fold

TL;DR

Peak Nano is expanding U.S. production of NanoPlex HDC nanolayer dielectric film with a new cast-film line at its Macedonia, Ohio, facility. The project targets a 20-fold production increase, with up to three million pounds of additional annual capacity at full production in the first quarter of 2028. NanoPlex HDC is a dielectric material for energy-storage and pulsed-power capacitors, including oil-impregnated film/foil constructions. RelatedPos

Peak Nano Scales NanoPlex HDC Capacitor Film Production 20-Fold

Peak Nano is expanding U.S. production of NanoPlex HDC nanolayer dielectric film with a new cast-film line at its Macedonia, Ohio, facility. The project targets a 20-fold production increase, with up to three million pounds of additional annual capacity at full production in the first quarter of 2028. NanoPlex HDC is a dielectric material for energy-storage and pulsed-power capacitors, including oil-impregnated film/foil constructions. Key features and benefits. New Davis-Standard cast-film line supporting mono-, multi-, and nanolayered films. $20 million investment in equipment, facilities, and staffing.

Schontek observation

The practical question for a buyer sourcing passive-component parts is what this changes about ordering today.
No specific orderable part number is named, so we would treat this as direction signal only and confirm the affected parts from the manufacturer announcement before quoting anything.
The checkable figures in this report (8 µm, 12 µm, 1 kHz, 25 °C) are the ones worth re-verifying against the datasheet, since pricing and lead time conversations turn on them.
Schontek holds independent stock and cross-references parts that go on allocation; send us a part number and we will confirm availability and delivery from our own position, not from this article.


Source: PassiveComponentsEU

Market context is useful. A specific answer is better. Availability and delivery terms are confirmed per RFQ.

Need the signal for one MPN?

Bring us the
part number.

Send the MPN, quantity and target date for a sourcing review.

Request a quote Check the stock index sales@schontek.com